Tunnel Lainz LT31

Site supervision
  • double-track railway tunnels
  • length: 3,050m
  • total cost: EUR 158.7 M
  • construction period: 2006-2011
Side wall drift in soft ground.
Two adit shafts, depth 30m
Cross section 132m² and 145m²
Tunnel drifts under built-up area with overburden ranging from 6 to 20m
Groundwater lowering by means of some 200 wells (gravitational and vacuum)